The Original Leisure Centre on the site was demolished and a new £25M leisure centre constructed on the similar footprint.
The new building includes a 25m, 8 lane pool with moveable floor, a learner pool, 4 court Sports hall, Gym and Spa over 2 storeys. There is also an ‘extreme’ Sports Hall attached to the building.
Furness Partnership was involved in the overall structural design, substructure analysis and drainage.